Stage-Gate Verification

Independent milestone inspection framework

Every project phase requires independent site survey approval before capital is disbursed. We inspect damp membranes, structural steel, and mechanical installations to eliminate contractor payment risk.

Site Verification

Three physical milestone gates

Gate 01

Substructure and groundwork

Surveyors verify excavation depths, trench cleanliness, reinforcement placement, and damp-proof membrane continuity before concrete pours. Invoices for substructure works remain frozen until laser-level benchmarks meet technical specifications.

Gate 02

Structural envelope and timbers

We physically audit load-bearing masonry, flitch beams, steel connections, and roof rafters against structural engineer drawings. Thermal insulation continuity and airtightness junctions undergo thorough inspection prior to external cladding closure.

Gate 03

Services rough-in and finish

Pressure testing of plumbing conduits, electrical circuit certification, and subfloor moisture readings must be documented. Only after our comprehensive snagging audit passes statutory thresholds is the contractor final retention tranche released.

Operating Principle

No verified site sign-off, no contractor funds released.

We maintain absolute fiscal separation between your project account and the builder, requiring signed technical certificates for every single currency release.

Verified Case Proof

Trade Craft halted a £48,000 drawdown when our underpinning showed 14mm lateral deflection. The contractor rectified the concrete collar at their own expense before work resumed.

David & Sarah M., Richmond basement alteration

Download sample inspection schedule

Review the full forty-point surveyor checklist used to audit residential structural stages across the UK.